Solutions That Build Value: We provide integrated design, construction, and management solutions tailored to every client. Through innovation, technology, and expertise, we optimize performance and maximize results.

Comprehensive Construction Services Tailored to Your Needs

Our business is to provide comprehensive solutions tailored to our clients’ needs, with the goal of optimizing and maximizing the profitability of their investments. To achieve this, we offer the following services:

Preconstruction & Custom Design

Virtual Design (Conceptual Design, Design Development, Construction Documentation, Analysis, Documentation)

We begin our conceptual designs by considering site preparation and architectural requirements, using tools such as Smart Build. These platforms allow us to visualize in 3D the best possible solutions according to each client’s needs, working within LOD 100–LOD 200.

Our process is driven by highly qualified staff, advanced technology, and continuous innovation. Our team includes architects, engineers, and 3D modelers, enabling us to work with BIM (Building Information Modeling) in a Common Data Environment (CDE). This approach optimizes asset solutions while ensuring effective information management for all stakeholders—supporting both project execution and future facility maintenance.

We then transfer these files in IFC and BIM formats into Revit, where we develop detailed designs and documentation, including Mechanical, Electrical, and Plumbing (MEP) and Heating, Ventilation, and Air Conditioning (HVAC) systems at Level of Development (LOD) 300.

Construction Documentation Phase (LOD 350)

  • Provide a coordinated and unified plan for construction.
  • Facilitate efficient resource planning and project delivery.
  • Reduce costly mistakes and minimize rework during construction.
  • Ensure the accurate installation of building components.

Once the plans are approved, we manage the process of obtaining all necessary construction permits, ensuring a smooth transition from design to execution.

3D architectural conceptual design model

Management Consulting Services (MCS, Project Management & BIM Team)

Planning Phase

We begin each project by developing a BIM Execution Plan (BEP). From the pre-construction phase, we create detailed plans in Revit, enabling us to generate take-offs and budgets using OPUS. This ensures that both pre-construction and construction phases are fully planned, monitored, and controlled. To track progress accurately, we use LiDAR technology for precise measurement of work advancement on-site.

With the Microsoft Project suite, we manage project scheduling at multiple levels—from daily task details to the overall master plan—providing clear follow-up across the different project phases.

Executive Phase

In this phase, we use the planning developed during pre-construction to manage procurement, project execution, and closure. Our proactive approach ensures that activities are clearly defined in advance, with weekly planning of tasks, assigned teams, and production levels. This allows us to keep the project on schedule, within budget, and aligned with quality standards.

We also conduct periodic evaluations of progress and achievements, enabling us to reorient strategies when necessary to maintain efficiency and successful delivery.

Monitoring & Controlling Phase

Using field data, we continuously update our models to monitor and control the project in real time. By integrating this information with Power BI, we maintain interactive dashboards that track the project’s Key Performance Indicators (KPIs), ensuring transparency and timely decision-making.

Close-Out Phase

In this phase, we carry out the legal, administrative, and technical closure of the project. All project information is compiled, organized, and transferred to the operations and maintenance team, ensuring a structured and efficient handover for long-term asset management.

Project management and BIM consulting services
Microsoft Project Gantt chart for construction projects
Project dashboard with KPIs in Power BI
Fabrication drawings for red iron steel kits

Fabrication

Fabrication (Red Steel Iron Kits, Trims, Gutters)

Construction

Building Construction (Residential, Commercial, Industrial, Institutional)

We have a skilled multidisciplinary team capable of working with designs up to LOD 300 and progressively updating information to LOD 400. This ensures that all stakeholders share accurate information and collaborate effectively, improving efficiency and asset quality.

Our approach is integrative and collaborative, leveraging BIM as the foundation and supported by the latest technologies to deliver innovative, high-quality solutions.

Coordinated construction process supported by BIM

Roofing Contractor

We conduct thorough field inspections and, based on the results, prepare budgets quickly and accurately. With materials readily available, we complete high-quality work in the shortest possible time. Backed by a team with over 25 years of experience, we ensure reliable, efficient, and professional delivery.

Roofing contractor inspecting metal roof system

Construction Material Sale

  • Steel Framing
  • Sheathing
  • Trim
  • Fasteners
  • Wood Framing
  • Wood Post
  • Wood Lumber
  • Trusses

We have skilled personnel managing a specialized construction materials store that directly supports our projects. This gives us a significant advantage by maintaining an inventory of essential materials, allowing efficient execution without delays. Our strategic partnerships also help reduce costs, ensuring greater value for our clients.

Construction materials such as steel framing and lumber in stock

Building Maintenance

We develop both preventive and corrective maintenance plans to ensure the proper upkeep of our clients’ assets. Our approach helps save time and reduce costs while extending the life cycle of equipment and facilities. With professional customer service, we provide clients peace of mind and confidence in the reliable operation of their assets.

Technician performing building maintenance on equipment

Disaster Response

We develop comprehensive emergency plans designed to protect people and assets. This includes recommending essential emergency kits, providing trained personnel, and advising on insurance coverage to safeguard company assets against natural disasters and unforeseen events.

Our response plan addresses key aspects such as:

  • Effective communication protocols
  • Safe evacuation procedures
  • Emergency assistance and asset protection

Additionally, our recovery plan focuses on damage assessment and the restoration of operations, ensuring business continuity with minimal disruption.

Post-disaster site assessment and recovery planning